Construction Delay Expert Witnesses
Construction delay expert witnesses and consultants listed here may be able to form expert opinions, draft expert witness reports, provide expert witness testimony at deposition and/or trial as or serve as consulting (non-testifying) experts on construction delay. The construction delay expert witness listings on this page are typically from fields/areas of expertise such as: Construction, Construction Defects, Dispute Resolution, and Engineering.
Hal K. Cain, PE Cain and Associates Engineers and Constructors, Inc.
Mobile, Alabama
Construction, Engineering
-
Construction Delay, Forensic Engineering, Construction Defects, Construction Claims, Construction Management, Structural Engineer, Roof Consultant, Foundation Engineer, Building Envelope Specialist, EIFS, Scheduling Engineer, Planning Engineer, Mechanical Engineer
Experienced forensic engineer and construction claims expert with residential, commercial, and industrial experience. Capable of evaluating structural failures, construction defects and delay claims by contractors. Has firm with experts in mechanical engineering, electrical engineering, plumbing, HVAC, roofing and EIFS. Testifying experience in depositions and courtroom. Extensive experience in the engineering and construction of large industrial plants, both manufacturing and petrochemical type facilities.
Caleb M. Sturm, PSP, CCP, CCA BRG Global Construction Advisory & Disputes Practice
Florida
Construction, Dispute Resolution
-
Construction Delay, Disruption, Productivity Loss, Quantum of Damages, Critical Path Delay, Change Orders, Scope Change, Termination, CPM Scheduling, Audit, Construction Claim, Acceleration, Cumulative Impact, Extended General Conditions, Extension of Time, Liquidated Damages, Concurrent Delay
Based in Atlanta, Georgia, Mr. Sturm is a Director in the BRG Global Construction Advisory & Disputes practice. Mr. Sturm is engaged regarding matters of schedule delay and work disruption, losses in contractor productivity, quantum of monetary damages, claim formulation & review, cost auditing, risk management, and project administration procedures. Mr. Sturm has performed analyses on claims ranging from $1 million to $350 million and is experienced in providing expert testimony.
Mr. Sturm also consults with parties in the planning, programming, control, and mitigation of project risk. His experience in prospective and forensic capacities allows him to uniquely anticipate risks and challenges prior to and during each stage of the project life cycle. Mr. Sturm is advanced in the development of best practices and procedures in the active management of significant multi‐year capital projects.
Mr. Sturm accumulated his construction industry experience through employment in both contr...
Caleb M. Sturm, PSP, CCP, CCA BRG Global Construction Advisory & Disputes Practice
Atlanta, Georgia
Construction, Dispute Resolution
-
Construction Delay, Disruption, Productivity Loss, Quantum of Damages, Critical Path Delay, Change Orders, Scope Change, Termination, CPM Scheduling, Audit, Construction Claim, Acceleration, Cumulative Impact, Extended General Conditions, Extension of Time, Liquidated Damages, Concurrent Delay
Based in Atlanta, Georgia, Mr. Sturm is a Director in the BRG Global Construction Advisory & Disputes practice. Mr. Sturm is engaged regarding matters of schedule delay and work disruption, losses in contractor productivity, quantum of monetary damages, claim formulation & review, cost auditing, risk management, and project administration procedures. Mr. Sturm has performed analyses on claims ranging from $1 million to $350 million and is experienced in providing expert testimony.
Mr. Sturm also consults with parties in the planning, programming, control, and mitigation of project risk. His experience in prospective and forensic capacities allows him to uniquely anticipate risks and challenges prior to and during each stage of the project life cycle. Mr. Sturm is advanced in the development of best practices and procedures in the active management of significant multi‐year capital projects.
Mr. Sturm accumulated his construction industry experience through employment in both contr...
Michael A. Pollock, P.E. Cogent Experts, LLC
New Jersey
Engineering, Construction Defects
-
Standard of care, construction defect, construction delay, engineering, mechanical engineering, HVAC, project management, construction schedule analysis, manufacturing, product liability, power, refrigeration, fire, explosion, automotive, forensics, failure analysis, engineering standard of care
Registrations
• Professional Engineer: PA (PE075410)
• American Bar Association (ABA) – Construction Forum
• Environmental Protection Agency (EPA) Clean Air Act Certification – Universal (includes Chillers,
HVAC & Refrigeration)
• United States Patent & Trademark Office Registered (USPTO)
Professional Affiliations
• American Society of Mechanical Engineers (ASME)
• American Society of Heating, Refrigeration, Air Conditioning Engineering (ASHRAE)
• American Arbitration Association (AAA)
• Certified Energy Manager (CEM)
• Product Developers and the Manufacturers Association PDMA
Supermarket Heating Ventilation, Air Conditioning & Refrigeration (HVACR) Matter – Florida - Provided expert witness field inspection and investigation of relevant HVACR and mechanical systems causing wet conditions via condensation. Guided counsel in deposition questions and developed the case strengths and weaknesses yielding a negotiated settlement favorable to our client.
Warehouse Distribut...
Caleb M. Sturm, PSP, CCP, CCA BRG Global Construction Advisory & Disputes Practice
New York
Construction, Dispute Resolution
-
Construction Delay, Disruption, Productivity Loss, Quantum of Damages, Critical Path Delay, Change Orders, Scope Change, Termination, CPM Scheduling, Audit, Construction Claim, Acceleration, Cumulative Impact, Extended General Conditions, Extension of Time, Liquidated Damages, Concurrent Delay
Based in Atlanta, Georgia, Mr. Sturm is a Director in the BRG Global Construction Advisory & Disputes practice. Mr. Sturm is engaged regarding matters of schedule delay and work disruption, losses in contractor productivity, quantum of monetary damages, claim formulation & review, cost auditing, risk management, and project administration procedures. Mr. Sturm has performed analyses on claims ranging from $1 million to $350 million and is experienced in providing expert testimony.
Mr. Sturm also consults with parties in the planning, programming, control, and mitigation of project risk. His experience in prospective and forensic capacities allows him to uniquely anticipate risks and challenges prior to and during each stage of the project life cycle. Mr. Sturm is advanced in the development of best practices and procedures in the active management of significant multi‐year capital projects.
Mr. Sturm accumulated his construction industry experience through employment in both contr...
Michael A. Pollock, P.E. Cogent Experts, LLC
Bryn Mawr, Pennsylvania
Engineering, Construction Defects
-
Standard of care, construction defect, construction delay, engineering, mechanical engineering, HVAC, project management, construction schedule analysis, manufacturing, product liability, power, refrigeration, fire, explosion, automotive, forensics, failure analysis, engineering standard of care
Registrations
• Professional Engineer: PA (PE075410)
• American Bar Association (ABA) – Construction Forum
• Environmental Protection Agency (EPA) Clean Air Act Certification – Universal (includes Chillers,
HVAC & Refrigeration)
• United States Patent & Trademark Office Registered (USPTO)
Professional Affiliations
• American Society of Mechanical Engineers (ASME)
• American Society of Heating, Refrigeration, Air Conditioning Engineering (ASHRAE)
• American Arbitration Association (AAA)
• Certified Energy Manager (CEM)
• Product Developers and the Manufacturers Association PDMA
Supermarket Heating Ventilation, Air Conditioning & Refrigeration (HVACR) Matter – Florida - Provided expert witness field inspection and investigation of relevant HVACR and mechanical systems causing wet conditions via condensation. Guided counsel in deposition questions and developed the case strengths and weaknesses yielding a negotiated settlement favorable to our client.
Warehouse Distribut...
Waine P. Hicks Carriage House Custom Homes & Interiors, Inc.
Franklin, Tennessee
Construction, Construction Defects
-
Construction Claims, Roof Consultant, Construction Delay, Construction Management, Workmanship Claims, Change Order Disputes, Costs to Complete, Contract Disputes, Safety Issues, Design Build Claims, Construction Failures, Structural Failures, Construction Fault, Construction Expert
Waine Hicks is a Tennessee licensed General Contractor Commercial/Residential with over 50 years of construction and building experience. Waine provides a broad range of services to insurance companies and law firms as well as construction, engineering and architectural firms that includes structural analysis and design, condition assessment, damage investigations, failure analysis, construction consulting and management, and expert testimony for construction claims and disputes. Responsible for field investigations, establish and coordinate expert teams for investigations, provides quality assurance, evaluation and supervision of in-progress construction for residential and commercial structures.
Waine is a recognized expert in assessing, evaluating, remediating and testimony and is proven to be influential.
Certifications:
Certified Varco Pruden Design/Build Steel Buildings for Williamson, Maury, Dickson and Rutherford Counties/Middle Tennessee
• Certified General Contractor ...