26 Construction Change Orders Expert Witnesses Found
Results Sorted Below by State
David J. Brotman, FAIA Sunset Consultants
Scottsdale, Arizona
Architecture, Construction
-
Standard of Care, Construction Document, Real Estate, Slip, Trip & Fall, Delay, Defect, Change Order, Building, Design, Coordination, Code Compliance, Contract Document, Management, Contract Administration, Architectural Detailing, Commercial, Retail, Hotel, Office, Institutional, Construction
Fellow of the American Institute of Architects with over fifty years of experience. Twenty-five years with RTKL Associates Inc., one of the World’s largest Architect and Engineering Firms, and served as its Vice-Chairman. Past Planning Commissioner on the City of Malibu Planning Commission. Skills include all facets of Architectural Practice. Worldwide, multi-million dollar project experience includes retail, office, hotel, institutional, and mixed-use. Recently, qualified and served as a Standard of Care, Coordination, and Delay Expert in a case involving a major retail project. This included deposition and trial testimony.
Christopher Lavache C. Lavache Management & Consulting, LLC
Arizona
Construction, Construction Defects
-
Construction Manager Expert, Estimator, Construction Scheduler, General Contractor Expert, Licensed General Contractor, Quality Assurance, Construction Defects, Schedule Delays and Impacts, Loss Control Advisor, Condominium, Commercial Office, High-End Residential
LICENSES/ CERTIFICATIONS:
California State Contractors License B 537312
LEED AP (Leadership in Energy and Environmental Design Accredited Professional)
Construction Quality Manager: CQM - NAVFAC/USACE - US Army Corps of Engineers Construction Quality Management for Contractors
SMAW - AWS Certified Welder
ASTM Certified Property Condition Assessments 2018
Massachusetts Construction Supervisor 1982 – 1997 (Expired)
2009 - Present: Construction Expert Witness, Litigation Consultant, and Construction Manager,
C. Lavache Management & Consulting, LLC.
Construction expert witness testimony and litigation consulting services include forensic document analysis, standard of care, cost estimating, forensic site investigations, contract disputes, schedule delay/impact analysis, expert to expert negotiations, report preparation, change order/cost and claim management, water intrusion and construction/material defect consulting....
Richard W Brand, AIA, NCARB, CPM, PMP, DBIA
Santa Monica, California
Architecture, Construction
-
Project Management, Program Management, Construction Management Standard of Care Failures, Construction Documents, Change Order, Design Coordination, Building Envelope Failure, Construction Defects, Architectural Professional Liability Failures, Water Intrusion, Construction Administration
Licensed Architect in California and Utah with over 40 years of experience in the field of Architecture and Construction Management and was responsible for managing multibillion-dollar, multi-site new construction and renovation projects throughout the United States. As an Expert Witness I have performed Standard of Care analysis of Architects/Engineer and Project Management Performance Reviews in Architect/Engineer negligence claims. Investigated Construction defects, Contractor Non-Compliance, and Owner Payment / Change Order Delay Claims....
Gary K Dempster, FAIA Stir Architecture
South Pasadena, California
Architecture, Construction
-
Professional Standard of Care,
Construction Documents Analysis,
Architectural Design and Coordination,
Building Code Analysis,
Scope of Work Definition,
Change Order Analysis,
Construction Administration,
Architectural Mediation
...I prepare proposals, craft contracts, oversee the creation of the contract documents and have primary responsibility during the Construction Administration phase. I am licensed in 7 states and have delivered projects in 11 states and 3 countries ranging in construction costs from $2,000,000 to $500,000,000,
Amy S Heine, PE, CCP, PSP Hirschmugl, Heine & Associates, Inc
Mammoth Lakes, California
Construction Engineering, Construction
-
Construction Engineering, Forensic Schedule Analysis, Claim Preparation, CPM Scheduling, Design-Build, Strategic Project Planning, Primavera P6, Construction Impacts, Delay Analysis, Infrastructure, Heavy Civil, Tunnels
...She has over 25 years of experience in the construction industry working in numerous roles, such as Senior Project Engineer, Project Controls Manager, Project Engineer, Project Estimator and Project Manager. She currently serves as Principal and President of Hirschmugl, Heine & Associates, where she offers expert consulting and engineering services in the areas of planning and scheduling, temporary works design, claims consulting, and project management.
Ms. Heine primarily works with Heavy Civil Contractors nationwide and has experience working on Federal, State and Local government Contracts. She has provided critical expert witness testimony on heavy civil projects in Utah, Washington D.C., and New York. Ms....
Christopher Lavache C. Lavache Management & Consulting, LLC
El Cajon, California
Construction, Construction Defects
-
Construction Manager Expert, Estimator, Construction Scheduler, General Contractor Expert, Licensed General Contractor, Quality Assurance, Construction Defects, Schedule Delays and Impacts, Loss Control Advisor, Condominium, Commercial Office, High-End Residential
LICENSES/ CERTIFICATIONS:
California State Contractors License B 537312
LEED AP (Leadership in Energy and Environmental Design Accredited Professional)
Construction Quality Manager: CQM - NAVFAC/USACE - US Army Corps of Engineers Construction Quality Management for Contractors
SMAW - AWS Certified Welder
ASTM Certified Property Condition Assessments 2018
Massachusetts Construction Supervisor 1982 – 1997 (Expired)
2009 - Present: Construction Expert Witness, Litigation Consultant, and Construction Manager,
C. Lavache Management & Consulting, LLC.
Construction expert witness testimony and litigation consulting services include forensic document analysis, standard of care, cost estimating, forensic site investigations, contract disputes, schedule delay/impact analysis, expert to expert negotiations, report preparation, change order/cost and claim management, water intrusion and construction/material defect consulting....
Fred B. Lott, AIA, ARA, CSI Fred Lott Architect
California
Architecture, Construction Defects
-
Architect & Engineer Negligence, Construction Defects, Fraudulent Change Orders, Construction License Agreement, Antitrust Complaint,
Standard of Care Responsibility & Compliance, Warehouse Thermal Comfort, Bid Steering, Treachery & Self-Dealing Related to Professional Practice Industry Standards
Various Types of Legal Matters that Have Benefited from Fred’s Involvement:
Architect & Engineer Negligence, Compliance with Americans with Disabilities Act, Failure to Tender Payments Due & Owing for Contract Work Performed,
Fraudulent Change Orders, Faulty Movie & Sound Recording Studios Construction, Faulty Sound Attenuation & Faulty Soundproofing,
Misappropriation of Trade Secrets, Roofing Failure & Related Building Damages, Industrial Climate Control Engineering, Thermal Comfort, & Labor Law,
Aiding & Abetting Fiduciary Duties, Labor Union Disputes, Fraud, Bribery of a Public Official, Criminal Coercion, Construction Defects,
Standard of Care Responsibility & Compliance, Adversary Breach of Contract, Unjust Enrichment, Antitrust Complaint - Sherman Antitrust Act,
Treachery & Self-Dealing Related to Professional Practice Industry Standards, Quantum Meruit, Defamation Per Se, Responsibility for Failure to Maintain a Building,
Fraudulent Claim...
Cliff Moser, AIA www.standard-of.care
Berkeley, California
Architecture, Construction
-
Healthcare Architecture, OSHPD, BIM, Integrated Project Delivery, Lean Construction, Construction Defects, Construction Claims, Quality Control/Quality Assurance, Hospitals, Schools, Slip and Fall, ADA, Contractor Non-Conformance, NAVFAC, Change Orders, Owner Payment Claims.
...Experienced Standard of Care consultant with a focus on Architect & Engineer Negligence, Construction Defects, Contractor Non-Compliance. Owner Payment Claims, Fraudulent Change Orders, Personal Injury, Insurance and Fire Claims.
Integrated Project Delivery and Lean Construction consultant.
20 years Architecture Experience -Design and Construction Administration experience in -Healthcare (Large California Hospitals and Medical Centers), Multi-family, Retail, Tenant Fit-out, K-12 Schools, NAVFAC contract administration and Office Buildings.
20+ years Owners Representative/Construction Administration experience in - multi-site K-12 school district design and construction program (including multiple prime contractor projects) and California Hospital and Healthcare portfolio management.
Developed and deployed innovative practice, design, production and delivery methodologies....
Marty D Wilson MDW Group, Inc
San Francisco, California
Construction, Construction Defects
-
Contract Compliance, Scope of Work, Cost Analysis, Change Orders, Schedule Delays, Punch Lists, Punchlists, Project Administration, Defects, Permit Inspection, Termination, Architecture, A&E MEP Engineering Design, Specifications, Constructability, Industry Standard Practices, Personal Injury
Marty Wilson founded and managed a Commercial Construction Company operating in San Francisco (where he built projects in 120+ Buildings, and his company earned annual Top 25 Contractor Listings in the SF Business Times), the Greater Bay Area, Sacramento, and four states.
Mr....
Jack W. Harris, CPA, MBA, CVA, CFE, MAFF, CFF, CGMA, CIA Jack W. Harris, Inc.
Denver, Colorado
Business Damages, Accounting
-
Commercial Litigation Damages, Construction Damages, Construction Cost Audits, Lost Profits, Business Valuation, Construction Defect Damages, Forensic Accounting, Business Damages, Business Interruption, Insurance Claims, Surety Claims Analysis, Personal Injury Damages, Wrongful Death Damages
...Harris is a forensic accounting expert with 44 years professional experience in the areas of commercial litigation damages, construction claims, construction damages quantification, construction cost audits, lost profits analyses, business valuation, business interruption, financial management, accounting, internal auditing, and fraud investigations. Mr. Harris has worked on numerous domestic and international projects. Mr. Harris serves as an independent expert and consultant, and has held various management auditing and controller positions with major accounting, construction, financial services, and diversified firms. Mr. Harris is admitted as a Neutral with the American Arbitration Association for accounting and construction matters. Mr. Harris’ industry focus includes but is not limited to construction, mining, energy, real estate and land development, insurance, surety, and related industries....
Fred B. Lott, AIA, ARA, CSI Fred Lott Architect
Westport, Connecticut
Architecture, Construction Defects
-
Architect & Engineer Negligence, Construction Defects, Fraudulent Change Orders, Construction License Agreement, Antitrust Complaint,
Standard of Care Responsibility & Compliance, Warehouse Thermal Comfort, Bid Steering, Treachery & Self-Dealing Related to Professional Practice Industry Standards
Various Types of Legal Matters that Have Benefited from Fred’s Involvement:
Architect & Engineer Negligence, Compliance with Americans with Disabilities Act, Failure to Tender Payments Due & Owing for Contract Work Performed,
Fraudulent Change Orders, Faulty Movie & Sound Recording Studios Construction, Faulty Sound Attenuation & Faulty Soundproofing,
Misappropriation of Trade Secrets, Roofing Failure & Related Building Damages, Industrial Climate Control Engineering, Thermal Comfort, & Labor Law,
Aiding & Abetting Fiduciary Duties, Labor Union Disputes, Fraud, Bribery of a Public Official, Criminal Coercion, Construction Defects,
Standard of Care Responsibility & Compliance, Adversary Breach of Contract, Unjust Enrichment, Antitrust Complaint - Sherman Antitrust Act,
Treachery & Self-Dealing Related to Professional Practice Industry Standards, Quantum Meruit, Defamation Per Se, Responsibility for Failure to Maintain a Building,
Fraudulent Claim...
Sanford Kaminsky, AIA, NCARB m2e Consulting Engineers
Miami - Coral Gables, Florida
Architecture, Construction Defects
-
Standard of Care, Failure Analysis, Construction Documents, Defect, Change Order, Building, Design, Condominium, Hospitality, Casino, gaming, Code Compliance, Contract Document, Field Management, Contract Administration, Commercial, Highrise, Retail, Hotel, Condo-Hotel, Institutional and Industrial.
...Multi-Billion Dollars of Experience Both Designed and Constructed. Skills Include All Facets of Architectural Practice, Including Condominium Defect Mitigation That Would Dismantle A Class Action Lawsuit. Worldwide Project Experience Includes Retail, Office, Hotel, Institutional, Aerospace and Mixed-Use. Deposed On Standard Of Care, AHCA Regulations Regarding The Design Of A Class III Operating Room, And A Wrongful Death Based On My OSHA Certification.
40+ years experience in construction defect litigation support and expert witness services for both plaintiff and defense attorneys. Experienced in field investigations, Failure Analysis water intrusion analysis, specialty construction methods, development of repair methodologies and de-watering techniques, trial preparation and expert witness testimony. Projects include commercial and high rise in California, Nevada, and Florida....
Fred B. Lott, AIA, ARA, CSI Fred Lott Architect
Florida
Architecture, Construction Defects
-
Architect & Engineer Negligence, Construction Defects, Fraudulent Change Orders, Construction License Agreement, Antitrust Complaint,
Standard of Care Responsibility & Compliance, Warehouse Thermal Comfort, Bid Steering, Treachery & Self-Dealing Related to Professional Practice Industry Standards
Various Types of Legal Matters that Have Benefited from Fred’s Involvement:
Architect & Engineer Negligence, Compliance with Americans with Disabilities Act, Failure to Tender Payments Due & Owing for Contract Work Performed,
Fraudulent Change Orders, Faulty Movie & Sound Recording Studios Construction, Faulty Sound Attenuation & Faulty Soundproofing,
Misappropriation of Trade Secrets, Roofing Failure & Related Building Damages, Industrial Climate Control Engineering, Thermal Comfort, & Labor Law,
Aiding & Abetting Fiduciary Duties, Labor Union Disputes, Fraud, Bribery of a Public Official, Criminal Coercion, Construction Defects,
Standard of Care Responsibility & Compliance, Adversary Breach of Contract, Unjust Enrichment, Antitrust Complaint - Sherman Antitrust Act,
Treachery & Self-Dealing Related to Professional Practice Industry Standards, Quantum Meruit, Defamation Per Se, Responsibility for Failure to Maintain a Building,
Fraudulent Claim...
Caleb M. Sturm, PSP, CCP, CCA BRG Global Construction Advisory & Disputes Practice
Florida
Construction, Dispute Resolution
-
Construction Delay, Disruption, Productivity Loss, Quantum of Damages, Critical Path Delay, Change Orders, Scope Change, Termination, CPM Scheduling, Audit, Construction Claim, Acceleration, Cumulative Impact, Extended General Conditions, Extension of Time, Liquidated Damages, Concurrent Delay.
...Sturm is a Director in the BRG Global Construction Advisory & Disputes practice. Mr. Sturm is engaged regarding matters of schedule delay and work disruption, losses in contractor productivity, quantum of monetary damages, claim formulation & review, cost auditing, risk management, and project administration procedures. Mr. Sturm has performed analyses on claims ranging from $1 million to $350 million and is experienced in providing expert testimony.
Mr. Sturm also consults with parties in the planning, programming, control, and mitigation of project risk. His experience in prospective and forensic capacities allows him to uniquely anticipate risks and challenges prior to and during each stage of the project life cycle. Mr. Sturm is advanced in the development of best practices and procedures in the active management of significant multi‐year capital projects.
Mr....
Fred B. Lott, AIA, ARA, CSI Fred Lott Architect
Indiana
Architecture, Construction Defects
-
Architect & Engineer Negligence, Construction Defects, Fraudulent Change Orders, Construction License Agreement, Antitrust Complaint,
Standard of Care Responsibility & Compliance, Warehouse Thermal Comfort, Bid Steering, Treachery & Self-Dealing Related to Professional Practice Industry Standards
Various Types of Legal Matters that Have Benefited from Fred’s Involvement:
Architect & Engineer Negligence, Compliance with Americans with Disabilities Act, Failure to Tender Payments Due & Owing for Contract Work Performed,
Fraudulent Change Orders, Faulty Movie & Sound Recording Studios Construction, Faulty Sound Attenuation & Faulty Soundproofing,
Misappropriation of Trade Secrets, Roofing Failure & Related Building Damages, Industrial Climate Control Engineering, Thermal Comfort, & Labor Law,
Aiding & Abetting Fiduciary Duties, Labor Union Disputes, Fraud, Bribery of a Public Official, Criminal Coercion, Construction Defects,
Standard of Care Responsibility & Compliance, Adversary Breach of Contract, Unjust Enrichment, Antitrust Complaint - Sherman Antitrust Act,
Treachery & Self-Dealing Related to Professional Practice Industry Standards, Quantum Meruit, Defamation Per Se, Responsibility for Failure to Maintain a Building,
Fraudulent Claim...
Michael A. Pollock, P.E. Cogent Experts, LLC
New Jersey
Engineering, Construction Defects
-
Standard of care, construction defect, construction delay, engineering, mechanical engineering, HVAC, project management, construction schedule analysis, manufacturing, product liability, power, refrigeration, fire, explosion, automotive, forensics, failure analysis, engineering standard of care
Registrations
• Professional Engineer: PA (PE075410)
• American Bar Association (ABA) – Construction Forum
• Environmental Protection Agency (EPA) Clean Air Act Certification – Universal (includes Chillers,
HVAC & Refrigeration)
• United States Patent & Trademark Office Registered (USPTO)
Professional Affiliations
• American Society of Mechanical Engineers (ASME)
• American Society of Heating, Refrigeration, Air Conditioning Engineering (ASHRAE)
• American Arbitration Association (AAA)
• Certified Energy Manager (CEM)
• Product Developers and the Manufacturers Association PDMA
Supermarket Heating Ventilation, Air Conditioning & Refrigeration (HVACR) Matter – Florida - Provided expert witness field inspection and investigation of relevant HVACR and mechanical systems causing wet conditions via condensation. Guided counsel in deposition questions and developed the case strengths and weaknesses yielding a negotiated settlement favorable to our client....
Zohaib A Alvi, PE za/engineering
Lake Ronkonkoma, New York
Structural Engineering, Building Inspection
-
Forensic Engineering, Structural Failure, Construction Issues, Special Inspections, Building Evaluation, Building Defects, Trips and Falls, Building Preservation, Building Repair, Retaining Walls, Foundations, Building Codes
...He is a graduate of State University of New York, Farmingdale State College, and holds a dual Bachelors of Science degree in Architectural Technology and Construction Management, along with an Engineering Leadership Certificate from Cornell University, and earned his Master of Engineering from SUNY Buffalo.
He is a Licensed Professional Engineer (P.E.) and maintain licensure in New York and multiple other states. He has extensive experience in the evaluation, repair, and rehabilitation of existing structures and historic buildings, verifying construction compliance with applicable building codes and contract specifications, evaluating impact of construction errors, change orders, and damages during construction. He is also highly experienced in forensic investigations evaluations, to determine the cause and origin of structural deficiencies, damage following accidents, weather-related damage, and other concerns, and has opined in legal matters concerning the same.
William N. Bernstein, AIA, NCARB, Leed@AP Empire Projects, Inc. / Bernstein & Associates, Architects
New York, New York
Architecture, Construction
-
ADA, Architect, Architectural Design, Architecture, Construction, Doctors’ Offices, Healthcare Architecture, Healthcare Design, Healthcare Construction, Hospital Architecture, Hospital Design, Hospital Construction, Hotels, Laboratories, Medical Offices, Offices, Premises Liability, Residential
...Bernstein offers multi-faceted expertise in the areas of architecture, design and construction. He is a member of the American Institute of Architect, Construction Specifications Institute, and Project Management Institute. He is the author of two books on architecture and has written or had written about him over (50) articles on architecture and construction. He has provided expert witness services on (26) cases which includes (3) new cases (as of May 2023). These cases have been located across the United States as well as internationally. Mr. Bernstein is an intelligent, articulate, and well-spoken professional....
Fred B. Lott, AIA, ARA, CSI Fred Lott Architect
New York
Architecture, Construction Defects
-
Architect & Engineer Negligence, Construction Defects, Fraudulent Change Orders, Construction License Agreement, Antitrust Complaint,
Standard of Care Responsibility & Compliance, Warehouse Thermal Comfort, Bid Steering, Treachery & Self-Dealing Related to Professional Practice Industry Standards
Various Types of Legal Matters that Have Benefited from Fred’s Involvement:
Architect & Engineer Negligence, Compliance with Americans with Disabilities Act, Failure to Tender Payments Due & Owing for Contract Work Performed,
Fraudulent Change Orders, Faulty Movie & Sound Recording Studios Construction, Faulty Sound Attenuation & Faulty Soundproofing,
Misappropriation of Trade Secrets, Roofing Failure & Related Building Damages, Industrial Climate Control Engineering, Thermal Comfort, & Labor Law,
Aiding & Abetting Fiduciary Duties, Labor Union Disputes, Fraud, Bribery of a Public Official, Criminal Coercion, Construction Defects,
Standard of Care Responsibility & Compliance, Adversary Breach of Contract, Unjust Enrichment, Antitrust Complaint - Sherman Antitrust Act,
Treachery & Self-Dealing Related to Professional Practice Industry Standards, Quantum Meruit, Defamation Per Se, Responsibility for Failure to Maintain a Building,
Fraudulent Claim...
Caleb M. Sturm, PSP, CCP, CCA BRG Global Construction Advisory & Disputes Practice
New York
Construction, Dispute Resolution
-
Construction Delay, Disruption, Productivity Loss, Quantum of Damages, Critical Path Delay, Change Orders, Scope Change, Termination, CPM Scheduling, Audit, Construction Claim, Acceleration, Cumulative Impact, Extended General Conditions, Extension of Time, Liquidated Damages, Concurrent Delay.
...Sturm is a Director in the BRG Global Construction Advisory & Disputes practice. Mr. Sturm is engaged regarding matters of schedule delay and work disruption, losses in contractor productivity, quantum of monetary damages, claim formulation & review, cost auditing, risk management, and project administration procedures. Mr. Sturm has performed analyses on claims ranging from $1 million to $350 million and is experienced in providing expert testimony.
Mr. Sturm also consults with parties in the planning, programming, control, and mitigation of project risk. His experience in prospective and forensic capacities allows him to uniquely anticipate risks and challenges prior to and during each stage of the project life cycle. Mr. Sturm is advanced in the development of best practices and procedures in the active management of significant multi‐year capital projects.
Mr....
Cliff Moser, AIA www.standard-of.care
Pennsylvania
Architecture, Construction
-
Healthcare Architecture, OSHPD, BIM, Integrated Project Delivery, Lean Construction, Construction Defects, Construction Claims, Quality Control/Quality Assurance, Hospitals, Schools, Slip and Fall, ADA, Contractor Non-Conformance, NAVFAC, Change Orders, Owner Payment Claims.
...Experienced Standard of Care consultant with a focus on Architect & Engineer Negligence, Construction Defects, Contractor Non-Compliance. Owner Payment Claims, Fraudulent Change Orders, Personal Injury, Insurance and Fire Claims.
Integrated Project Delivery and Lean Construction consultant.
20 years Architecture Experience -Design and Construction Administration experience in -Healthcare (Large California Hospitals and Medical Centers), Multi-family, Retail, Tenant Fit-out, K-12 Schools, NAVFAC contract administration and Office Buildings.
20+ years Owners Representative/Construction Administration experience in - multi-site K-12 school district design and construction program (including multiple prime contractor projects) and California Hospital and Healthcare portfolio management.
Developed and deployed innovative practice, design, production and delivery methodologies....
Michael A. Pollock, P.E. Cogent Experts, LLC
Bryn Mawr, Pennsylvania
Engineering, Construction Defects
-
Standard of care, construction defect, construction delay, engineering, mechanical engineering, HVAC, project management, construction schedule analysis, manufacturing, product liability, power, refrigeration, fire, explosion, automotive, forensics, failure analysis, engineering standard of care
Registrations
• Professional Engineer: PA (PE075410)
• American Bar Association (ABA) – Construction Forum
• Environmental Protection Agency (EPA) Clean Air Act Certification – Universal (includes Chillers,
HVAC & Refrigeration)
• United States Patent & Trademark Office Registered (USPTO)
Professional Affiliations
• American Society of Mechanical Engineers (ASME)
• American Society of Heating, Refrigeration, Air Conditioning Engineering (ASHRAE)
• American Arbitration Association (AAA)
• Certified Energy Manager (CEM)
• Product Developers and the Manufacturers Association PDMA
Supermarket Heating Ventilation, Air Conditioning & Refrigeration (HVACR) Matter – Florida - Provided expert witness field inspection and investigation of relevant HVACR and mechanical systems causing wet conditions via condensation. Guided counsel in deposition questions and developed the case strengths and weaknesses yielding a negotiated settlement favorable to our client....
Waine P. Hicks Carriage House Custom Homes & Interiors, Inc.
Franklin, Tennessee
Construction, Construction Defects
-
Construction Claims, Roof Consultant, Construction Delay, Construction Management, Workmanship Claims, Change Order Disputes, Costs to Complete, Contract Disputes, Safety Issues, Design Build Claims, Construction Failures, Structural Failures, Construction Fault, Construction Expert
Waine Hicks is a Tennessee licensed General Contractor Commercial/Residential with over 50 years of construction and building experience. Waine provides a broad range of services to insurance companies and law firms as well as construction, engineering and architectural firms that includes structural analysis and design, condition assessment, damage investigations, failure analysis, construction consulting and management, and expert testimony for construction claims and disputes. Responsible for field investigations, establish and coordinate expert teams for investigations, provides quality assurance, evaluation and supervision of in-progress construction for residential and commercial structures.
Waine is a recognized expert in assessing, evaluating, remediating and testimony and is proven to be influential....
Caleb M. Sturm, PSP, CCP, CCA BRG Global Construction Advisory & Disputes Practice
Nashville, Tennessee
Construction, Dispute Resolution
-
Construction Delay, Disruption, Productivity Loss, Quantum of Damages, Critical Path Delay, Change Orders, Scope Change, Termination, CPM Scheduling, Audit, Construction Claim, Acceleration, Cumulative Impact, Extended General Conditions, Extension of Time, Liquidated Damages, Concurrent Delay.
...Sturm is a Director in the BRG Global Construction Advisory & Disputes practice. Mr. Sturm is engaged regarding matters of schedule delay and work disruption, losses in contractor productivity, quantum of monetary damages, claim formulation & review, cost auditing, risk management, and project administration procedures. Mr. Sturm has performed analyses on claims ranging from $1 million to $350 million and is experienced in providing expert testimony.
Mr. Sturm also consults with parties in the planning, programming, control, and mitigation of project risk. His experience in prospective and forensic capacities allows him to uniquely anticipate risks and challenges prior to and during each stage of the project life cycle. Mr. Sturm is advanced in the development of best practices and procedures in the active management of significant multi‐year capital projects.
Mr....
EJ Janik, CPA, CFF, CFE, CFLC, MS Janik Forensics PC
Dallas, Texas
Business Damages, Accounting
-
Damages Lost Profits, Forensic Accounting, Construction Claims, Business Interruption , Insurance Claims, Product liability claims , Theft of Trade Secrets , Whistle blower cases, Antitrust/Pricing issues, Business valuations, Contract disputes, Dispute Resolution, Energy, Oli & Gas , M & A
EXPERIENCE
• Over 60 trial/hearing testimonies in 8 states: 11 Federal, 23 State, 25 Arbitration
• Over 90 total expert testimony matters
• Over 790 business dispute and consulting matters
• 150 financial audits (Public Accounting – 7 years)
• Significant engineering & construction experience
EJ JANIK, CPA, CFF, CFE, CFLC, MS
CPA = Certified Public Accountant
CFF = Certified in Financial Forensics
CFE = Certified Fraud Examiner
CFLC = Certified Forensic Litigation Consultant
FIRM SERVICES
Business and Dispute Consulting
Construction and Contract Claims
Damage Analysis / Critiques
Fact Finding / Graphic Analytics
Opinions / Reports
Accounting / Financial / Economic Modeling
Contract Accounting
Projections and Trend Analysis
Color Graphic Damage Modeling
Trial Exhibits and Expert Testimony
OVERALL EXPERIENCE
Antitrust/Pricing Issues
Audits
Bankruptcy Analyses
Business Interruption
Business Valuations
Construction Claims
Contract Disputes
Cost Determinations
Criminal...
Fred B. Lott, AIA, ARA, CSI Fred Lott Architect
Texas
Architecture, Construction Defects
-
Architect & Engineer Negligence, Construction Defects, Fraudulent Change Orders, Construction License Agreement, Antitrust Complaint,
Standard of Care Responsibility & Compliance, Warehouse Thermal Comfort, Bid Steering, Treachery & Self-Dealing Related to Professional Practice Industry Standards
Various Types of Legal Matters that Have Benefited from Fred’s Involvement:
Architect & Engineer Negligence, Compliance with Americans with Disabilities Act, Failure to Tender Payments Due & Owing for Contract Work Performed,
Fraudulent Change Orders, Faulty Movie & Sound Recording Studios Construction, Faulty Sound Attenuation & Faulty Soundproofing,
Misappropriation of Trade Secrets, Roofing Failure & Related Building Damages, Industrial Climate Control Engineering, Thermal Comfort, & Labor Law,
Aiding & Abetting Fiduciary Duties, Labor Union Disputes, Fraud, Bribery of a Public Official, Criminal Coercion, Construction Defects,
Standard of Care Responsibility & Compliance, Adversary Breach of Contract, Unjust Enrichment, Antitrust Complaint - Sherman Antitrust Act,
Treachery & Self-Dealing Related to Professional Practice Industry Standards, Quantum Meruit, Defamation Per Se, Responsibility for Failure to Maintain a Building,
Fraudulent Claim...