Change Orders Expert Witnesses

Change orders expert witnesses and consultants listed here may be able to form expert opinions, draft expert witness reports, provide expert witness testimony at deposition and/or trial as or serve as consulting (non-testifying) experts on change orders. The change orders expert witness listings on this page are typically from fields/areas of expertise such as: Architecture, Business Operations, Construction, Construction Defects, Construction Engineering, Dispute Resolution, Procurement/Purchasing, and Property Damage.

View Full Profile

David J. Brotman, FAIA

Architect with 55+ Yrs Major Project Experience

Sunset Consultants

Scottsdale, Arizona
Architecture, Construction Defects - Standard of Care, Construction Document, Real Estate, Slip trip & fall, Trip & Fall, Delay, Defect, Change Order, Building, Design, Coordination, Code Compliance, Contract Document, Management, Contract Administration, Architectural Detailing, Commercial, Retail, Hotel, Office
David J. Brotman, FAIA, is a nationally recognized architect and expert witness with over five decades of experience in architectural design, construction, and professional practice. As a Fellow of the American Institute of Architects (FAIA), Mr. Brotman has achieved the highest level of professional distinction. He is celebrated for his contributions to the advancement of architecture nationally and internationally. He spent 25 years with one of the world’s largest architecture and engineering firms, leading worldwide major commercial, retail, institutional, and mixed-use developments. His portfolio includes transformative projects such as the Shanghai Science and Technology Center — a project awarded through an international competition and publicly announced at a press conference in Shanghai by President Bill Clinton and the Mayor of Shanghai — as well as the extensive 1988 renovation and expansion of Tysons Corner Center, which introduced the first Nordstrom on the East Coast a...
View Full Profile

Rosa Loloee

Construction Claims and Forensic Analysis Expert

NuStandard Engineering

San Diego, California
Construction, Construction Engineering - Construction Claims, Delay Analysis, Change Orders, Forensic Scheduling, Cost Escalation, Utility Coordination Disputes, Public Infrastructure, Highway Projects, Design-Build Conflicts, Caltrans Claims, Contract Disputes, Claim Preparation, Time Impact Analysis, Unforeseen Condition Claims, Design Error and Omission Claims
Rosa Loloee is a licensed Professional Engineer and seasoned construction executive with over 15 years of experience specializing in public infrastructure, transportation projects, and dispute resolution. She is the founder and President of NuStandard Engineering, a consulting firm based in California that provides expert services in construction claims, including forensic schedule analysis, unforeseen conditions, design errors and omissions, delay quantification, and cost escalation evaluation. Rosa serves as a trusted dispute resolution advisor in both California and Florida, assisting legal teams, contractors, and public agencies with complex construction conflicts, claim evaluations, and contract interpretation. Her work spans from early-stage claim development to litigation support and expert testimony. She has led teams on dozens of transportation and public works projects, managing CPM scheduling, change orders, time impact analysis, and utility coordination disputes for bo...
View Full Profile

Marty D Wilson

Construction & Related Issues Expert

MDW Group, Inc

San Francisco, California
Construction, Construction Defects - Contract Compliance, Scope of Work, Cost Analysis, Change Orders, Constructability, Punch Lists, Schedule Delays, Project Administration, Personal Injury, Permit Inspection, GC Termination, Architecture, A&E MEP Engineering Design, Specifications, Industry Standard Practices, Lease Work Letters, Lease Restoration Disputes
Marty Wilson founded and managed a Commercial Construction Company operating in San Francisco (where he built projects in 130+ Buildings, and his company earned annual Top 25 Contractor Listings in the SF Business Times), the Greater Bay Area, Sacramento, and four states. Mr. Wilson offers 45+ Years of Experience and Expertise in the following Construction Categories: • Structural and Seismic Rehabs, Shell and Core, Base Building, Tenant Improvements, • Prelim Design Drawing Plan Checking & Review, Constructability Analysis, Value Engineering, • Conceptual Estimating and Budgeting, • Bid Solicitations, Contractor Prequalification, Union and Non-Union Considerations, • Plans & Spec Hard Cost Bidding, • Build To Suit & Design Build, • Bid Comparisons, Leveling and Analysis, • Lump Sum, Cost Plus, Time and Material, GMP, Procedures, Requirements, • Contract Documentation, Forms, Details, Exhibits, and Assembly, • Subcontract Documentation, Forms, and Assembly, • Project Commencement...
View Full Profile

Christopher Heese

Comprehensive Analyst for Construction Issues

Heese Consulting

Colorado
Construction, Construction Defects - Construction Management CM, General Contractor GC, Construction Delays, Construction Claims Disputes, Critical Path Schedule, Preconstruction Estimating, Site Planning & Logistics, Scope of Work Analysis, Construction Costs, Change Orders, Subcontractor, Contract Default, Standard of Care
Construction expert with over 30 years of experience in the industry managing projects in multiple U.S. states and internationally as a developer, general contractor, and subcontractor. Industry positions in the field, project management, risk management, and currently as an executive. Accomplished in corporate and project risk management & mitigation utilizing a variety of contract formats including design-build, design-assist, CM-at-Risk, Guaranteed Maximum Price (GMP), and lump sum. Experience in mediation, deposition, and testimony at trial. Comprehensive, organized, professional analyst with firsthand knowledge in construction disputes, construction defects, subcontractor defaults, and industry standard practices. I will provide you with fact-based reporting with clearly stated opinions. I can help you understand how a variety of information (some of which may be ambiguous) may apply to a central issue, and how decisions made early in a project can have a domino effect...
View Full Profile

James J. Cloud, CGC, CCC, CMC, CFC, CPC, CAM, BK, MSIRE

Construction Expert Witness | Florida Contractor

Cloud Design Build

Miami Beach, Florida
Construction, Property Damage - Construction Expert Witness, Construction Defects, Standard of Care, Building Code Compliance, Contractor Licensing, Construction Claims, Construction Contracts, Change Orders, Property Damage, Water Intrusion, Building Envelope, Real Estate, Residential Construction, Commercial Construction, Permitting, Project Management
James J. Cloud is a Florida General Contractor, construction expert witness, and licensed real estate broker with over 20 years of experience across residential, commercial, and large-scale development projects. His work focuses on evaluating construction practices, identifying failures, and determining how those conditions impact property performance, building code compliance, and real estate transactions. His experience spans South Florida, Southwest Florida, and throughout Florida, including major developments across Miami-Dade, Broward, and Palm Beach counties. He provides expert analysis, consulting, written reports, and testimony in matters involving construction defects, contractor standard of care, building code compliance, contractor licensing, construction claims, and property damage disputes. Mr. Cloud also evaluates construction and real estate-related issues tied to property transactions, including latent defects, disclosure-related matters, and post-sale defect claim...
View Full Profile

Caleb M. Sturm, PSP, CCP, CCA

Forensic Schedule/Delay and Damages Expert

BRG Global Construction Advisory & Disputes Practice

Florida
Construction, Dispute Resolution - Construction Delay, Disruption, Productivity Loss, Quantum of Damages, Critical Path Delay, Change Orders, Scope Change, Termination, CPM Scheduling, Audit, Construction Claim, Acceleration, Cumulative Impact, Extended General Conditions, Extension of Time, Liquidated Damages, Concurrent Delay
According to Lexology Index: Mr. Sturm is known for being "extremely competent, knowledgeable and reliable." Mr. Sturm excels in delivering clear, well-structured expert opinions in construction disputes, with his "great subject matter expertise" and "top quality work product," earning him recognition in arbitration and litigation proceedings." Mr. Sturm has over 20 years of experience in the engineering and construction industry working in contractor, owner, and and expert consultant capacities. His expertise was developed while working on the delivery of large-scale and complex construction projects and within the context of claims and disputes. He has been appointed as an independent expert providing both written and oral opinion evidence regarding matters of programming and project delay, studies in working disruption and productivity, extension of time entitlement, forensic accounting, job cost auditing, and the quantification of additional costs incurred. Mr. Sturm has a de...
View Full Profile

Caleb M. Sturm, PSP, CCP, CCA

Forensic Schedule/Delay and Damages Expert

BRG Global Construction Advisory & Disputes Practice

Atlanta, Georgia
Construction, Dispute Resolution - Construction Delay, Disruption, Productivity Loss, Quantum of Damages, Critical Path Delay, Change Orders, Scope Change, Termination, CPM Scheduling, Audit, Construction Claim, Acceleration, Cumulative Impact, Extended General Conditions, Extension of Time, Liquidated Damages, Concurrent Delay
According to Lexology Index: Mr. Sturm is known for being "extremely competent, knowledgeable and reliable." Mr. Sturm excels in delivering clear, well-structured expert opinions in construction disputes, with his "great subject matter expertise" and "top quality work product," earning him recognition in arbitration and litigation proceedings." Mr. Sturm has over 20 years of experience in the engineering and construction industry working in contractor, owner, and and expert consultant capacities. His expertise was developed while working on the delivery of large-scale and complex construction projects and within the context of claims and disputes. He has been appointed as an independent expert providing both written and oral opinion evidence regarding matters of programming and project delay, studies in working disruption and productivity, extension of time entitlement, forensic accounting, job cost auditing, and the quantification of additional costs incurred. Mr. Sturm has a de...
View Full Profile

Christopher Heese

Comprehensive Analyst for Construction Issues

Heese Consulting

Illinois
Construction, Construction Defects - Construction Management CM, General Contractor GC, Construction Delays, Construction Claims Disputes, Critical Path Schedule, Preconstruction Estimating, Site Planning & Logistics, Scope of Work Analysis, Construction Costs, Change Orders, Subcontractor, Contract Default, Standard of Care
Construction expert with over 30 years of experience in the industry managing projects in multiple U.S. states and internationally as a developer, general contractor, and subcontractor. Industry positions in the field, project management, risk management, and currently as an executive. Accomplished in corporate and project risk management & mitigation utilizing a variety of contract formats including design-build, design-assist, CM-at-Risk, Guaranteed Maximum Price (GMP), and lump sum. Experience in mediation, deposition, and testimony at trial. Comprehensive, organized, professional analyst with firsthand knowledge in construction disputes, construction defects, subcontractor defaults, and industry standard practices. I will provide you with fact-based reporting with clearly stated opinions. I can help you understand how a variety of information (some of which may be ambiguous) may apply to a central issue, and how decisions made early in a project can have a domino effect...
View Full Profile

Lane A Feick, PE

Construction Issues Expert Witness

Owner Rep Consulting

Annapolis, Maryland
Construction, Construction Defects - Estimating, Project Management, Cost Control, Claims, Change Orders, Differing Site Conditions, Breaches of Contract, Leaks, Grading, Site Work, Scheduling, Critical Path
Oversight of daily field operations inclusive of coordinating subcontractors, suppliers and field employees, quality control, monitoring the project schedule and maintaining a safe workplace. Thirty (30+) years of construction management, general contracting, and bank inspection experience. Licensed Professional Engineer in Maryland, South Carolina, North Carolina, and Georgia.
View Full Profile

Christopher Heese

Comprehensive Analyst for Construction Issues

Heese Consulting

Minnesota
Construction, Construction Defects - Construction Management CM, General Contractor GC, Construction Delays, Construction Claims Disputes, Critical Path Schedule, Preconstruction Estimating, Site Planning & Logistics, Scope of Work Analysis, Construction Costs, Change Orders, Subcontractor, Contract Default, Standard of Care
Construction expert with over 30 years of experience in the industry managing projects in multiple U.S. states and internationally as a developer, general contractor, and subcontractor. Industry positions in the field, project management, risk management, and currently as an executive. Accomplished in corporate and project risk management & mitigation utilizing a variety of contract formats including design-build, design-assist, CM-at-Risk, Guaranteed Maximum Price (GMP), and lump sum. Experience in mediation, deposition, and testimony at trial. Comprehensive, organized, professional analyst with firsthand knowledge in construction disputes, construction defects, subcontractor defaults, and industry standard practices. I will provide you with fact-based reporting with clearly stated opinions. I can help you understand how a variety of information (some of which may be ambiguous) may apply to a central issue, and how decisions made early in a project can have a domino effect...
View Full Profile

Christopher Heese

Comprehensive Analyst for Construction Issues

Heese Consulting

Missouri
Construction, Construction Defects - Construction Management CM, General Contractor GC, Construction Delays, Construction Claims Disputes, Critical Path Schedule, Preconstruction Estimating, Site Planning & Logistics, Scope of Work Analysis, Construction Costs, Change Orders, Subcontractor, Contract Default, Standard of Care
Construction expert with over 30 years of experience in the industry managing projects in multiple U.S. states and internationally as a developer, general contractor, and subcontractor. Industry positions in the field, project management, risk management, and currently as an executive. Accomplished in corporate and project risk management & mitigation utilizing a variety of contract formats including design-build, design-assist, CM-at-Risk, Guaranteed Maximum Price (GMP), and lump sum. Experience in mediation, deposition, and testimony at trial. Comprehensive, organized, professional analyst with firsthand knowledge in construction disputes, construction defects, subcontractor defaults, and industry standard practices. I will provide you with fact-based reporting with clearly stated opinions. I can help you understand how a variety of information (some of which may be ambiguous) may apply to a central issue, and how decisions made early in a project can have a domino effect...
View Full Profile

Christopher Heese

Comprehensive Analyst for Construction Issues

Heese Consulting

Gretna, Nebraska
Construction, Construction Defects - Construction Management CM, General Contractor GC, Construction Delays, Construction Claims Disputes, Critical Path Schedule, Preconstruction Estimating, Site Planning & Logistics, Scope of Work Analysis, Construction Costs, Change Orders, Subcontractor, Contract Default, Standard of Care
Construction expert with over 30 years of experience in the industry managing projects in multiple U.S. states and internationally as a developer, general contractor, and subcontractor. Industry positions in the field, project management, risk management, and currently as an executive. Accomplished in corporate and project risk management & mitigation utilizing a variety of contract formats including design-build, design-assist, CM-at-Risk, Guaranteed Maximum Price (GMP), and lump sum. Experience in mediation, deposition, and testimony at trial. Comprehensive, organized, professional analyst with firsthand knowledge in construction disputes, construction defects, subcontractor defaults, and industry standard practices. I will provide you with fact-based reporting with clearly stated opinions. I can help you understand how a variety of information (some of which may be ambiguous) may apply to a central issue, and how decisions made early in a project can have a domino effect...
View Full Profile

David Del Vecchio, AIA, CID, RCS, NCARB, LEEDap

Design and Construction Expert Witness

David Del Vecchio, Architect, LLC

Cranford, New Jersey
Architecture, Construction Defects - ADA, OSHA, Contracts, Tenant / Landlord, Construction Administration, Interior Design, AIA Contract Documents, Design Defects, Standard of Care, Affidavit of Merit, Architectural Copyright / Intellectual Property, Residential Design, Commercial / Retail Design, Change Orders, Building Envelope, Consumer Fraud Act
David Del Vecchio has over 34 years experience as an active practicing architect and expert witness. He is licensed in multiple states and is a Certified Interior Designer in NJ. He holds an RCS Building Inspector license, and an NCARB certificate. Licensed in NJ, NY, CT, PA, MA, and FL. Provided expert services in IL and the Bahamas. David taught at Essex County College for 8 years, including Construction Means and Methods, Architectural Design, and Architectural History. Cases have involved ADA / Building Accessibility; Personal injuries and wrongful death matters involving design or construction; Building codes and associated regulations; Building envelope design, water infiltration, mold, EIFS, roofing, windows, vapor barrier, masonry specifications, standing seam roofing, flat roofs; Architectural copyright, intellectual property, standard of care; Premises litigation, BOMA / Common Area / Tenant Area measurements and area calculations; Illegal construction / construction w...
View Full Profile

David Del Vecchio, AIA, CID, RCS, NCARB, LEEDap

Design and Construction Expert Witness

David Del Vecchio, Architect, LLC

New York
Architecture, Construction Defects - ADA, OSHA, Contracts, Tenant / Landlord, Construction Administration, Interior Design, AIA Contract Documents, Design Defects, Standard of Care, Affidavit of Merit, Architectural Copyright / Intellectual Property, Residential Design, Commercial / Retail Design, Change Orders, Building Envelope, Consumer Fraud Act
David Del Vecchio has over 34 years experience as an active practicing architect and expert witness. He is licensed in multiple states and is a Certified Interior Designer in NJ. He holds an RCS Building Inspector license, and an NCARB certificate. Licensed in NJ, NY, CT, PA, MA, and FL. Provided expert services in IL and the Bahamas. David taught at Essex County College for 8 years, including Construction Means and Methods, Architectural Design, and Architectural History. Cases have involved ADA / Building Accessibility; Personal injuries and wrongful death matters involving design or construction; Building codes and associated regulations; Building envelope design, water infiltration, mold, EIFS, roofing, windows, vapor barrier, masonry specifications, standing seam roofing, flat roofs; Architectural copyright, intellectual property, standard of care; Premises litigation, BOMA / Common Area / Tenant Area measurements and area calculations; Illegal construction / construction w...
View Full Profile

Mark S Eksuzian, R.A., NCARB

Construction Defects Expert Witness

Mark Dean Associates, Inc

Newburgh, New York
Construction, Architecture - Std of Care, Change Orders, Design Evaluation, Proj. Feasibility, Poj. Filing, Const Defects, Mitigation, Doc Compliance, Scheduling, Protect Review, Contract Admin, Conflict Resolution, Pre-const., Waterproofing, Roof Systems, Cost Mgmnt, Proj. Mgmt, Proj. Design, Hist. Preserv., Spec. devel.
Mark Eksuzian is a multi-state licensed architect with extensive experience in high-rise and out-of-ground projects across the single home, multi-family, hospitality, commercial and industrial sectors. His expertise in design, cost management, procurement, and collaboration with contractors makes him a trusted and invaluable team member in the field. With a strong background in construction operations, expert witness work, and standard of care, Mark excels at identifying and resolving project conflicts while providing insightful explanations of construction processes, changes and construction defects. Mark’s commitment to continuous learning ensures he remains at the forefront of industry trends and best practices. He is ready to become an integral part of your team and contribute his expertise to your design and construction cases. Learn more about his work at www.markdean21.com. Let’s start the conversation—Call Mark now at 203-339-2379 to explore how he can assist your team.
View Full Profile

Caleb M. Sturm, PSP, CCP, CCA

Forensic Schedule/Delay and Damages Expert

BRG Global Construction Advisory & Disputes Practice

North Carolina
Construction, Dispute Resolution - Construction Delay, Disruption, Productivity Loss, Quantum of Damages, Critical Path Delay, Change Orders, Scope Change, Termination, CPM Scheduling, Audit, Construction Claim, Acceleration, Cumulative Impact, Extended General Conditions, Extension of Time, Liquidated Damages, Concurrent Delay
According to Lexology Index: Mr. Sturm is known for being "extremely competent, knowledgeable and reliable." Mr. Sturm excels in delivering clear, well-structured expert opinions in construction disputes, with his "great subject matter expertise" and "top quality work product," earning him recognition in arbitration and litigation proceedings." Mr. Sturm has over 20 years of experience in the engineering and construction industry working in contractor, owner, and and expert consultant capacities. His expertise was developed while working on the delivery of large-scale and complex construction projects and within the context of claims and disputes. He has been appointed as an independent expert providing both written and oral opinion evidence regarding matters of programming and project delay, studies in working disruption and productivity, extension of time entitlement, forensic accounting, job cost auditing, and the quantification of additional costs incurred. Mr. Sturm has a de...
View Full Profile

Christoph Mlinarchik

Government Contracts Expert, Author, Instructor

Christoph LLC

Alexandria, Virginia
Procurement/Purchasing, Business Operations - government contracts, federal contracts, subcontracts, Federal Acquisition Regulation, FAR clauses, Defense Federal Acquisition Regulation Supplement, DFARS, bids, quotes, offers, change orders, false claims, bid rigging, prime contractor, proposals, GSA, GAO, SBA, procurement, contracting officer
Specializing in GOVERNMENT CONTRACTS AND SUBCONTRACTS, Christoph Mlinarchik, JD, CFCM, PMP is an attorney, former federal contracting officer, professional instructor, top consultant, frequent public speaker, nationally recognized subject matter expert, and prolific author of 50+ publications, including the three bestselling books in The Government Contracts in Plain English Series. Christoph was honored with the “Top Professionals Under 40” and “Best Article of the Year” awards by National Contract Management Association (NCMA). Christoph is an experienced expert witness in GOVERNMENT CONTRACTS AND SUBCONTRACTS who has provided expert opinions and reports, deposition testimony, and research concerning damages, key findings, and case strategy for complex litigation. Expertise include the Federal Acquisition Regulation (FAR), Defense FAR Supplement (DFARS), bid rigging, false claims, sole source (no bid) contracts, procurement rules, competition requirements, ethics, Requests for E...