Critical Path Method (Cpm) Expert Witnesses
Critical path method (cpm) expert witnesses and consultants listed here may be able to form expert opinions, draft expert witness reports, provide expert witness testimony at deposition and/or trial as or serve as consulting (non-testifying) experts on critical path method (cpm). The critical path method (cpm) expert witness listings on this page are typically from fields/areas of expertise such as: Construction, Construction Defects, Construction Engineering, and OSHA.
View Full Profile
Amin Terouhid, Ph.D., PE, PMP, CFE
Scheduling, defect, safety, damages,& fraud expert
Adroit Consultants, LLC
Florida
Construction Defects, OSHA
-
Civil Engineering, industrial engineering, forensic schedule and delay analysis, construction safety, slip and fall, construction injury, personal injury, standard of care, fraud, construction inspection, loss of productivity, critical path method (CPM), OSHA, damages expert, damages analysis, trip and fall, CPM, scheduling, Delay
Dr. Amin Terouhid is a Principal Consultant with Adroit Consultants, LLC. He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, construction defects, construction fraud, defects, and injury cases. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims.
Served numerous times as an expert witness in trial, testimony, and deposition.
Licenses
• Examined and certified as a Professional Engineer (P.E.)
• Examined and certified by the Association of Certified Fraud Examiners as a Certified Fraud Examiner (CFE)
• Examined and certified by Project Management Institute (PMI) as a Project Management Professional (PMP)
• Examined and certified by the Association for the Advancement of Cost Engineering (AACE International) as a Planning and S...
View Full Profile
Amin Terouhid, Ph.D., PE, PMP, CFE
Scheduling, defect, safety, damages,& fraud expert
Adroit Consultants, LLC
Georgia
Construction Defects, OSHA
-
Civil Engineering, industrial engineering, forensic schedule and delay analysis, construction safety, slip and fall, construction injury, personal injury, standard of care, fraud, construction inspection, loss of productivity, critical path method (CPM), OSHA, damages expert, damages analysis, trip and fall, CPM, scheduling, Delay
Dr. Amin Terouhid is a Principal Consultant with Adroit Consultants, LLC. He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, construction defects, construction fraud, defects, and injury cases. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims.
Served numerous times as an expert witness in trial, testimony, and deposition.
Licenses
• Examined and certified as a Professional Engineer (P.E.)
• Examined and certified by the Association of Certified Fraud Examiners as a Certified Fraud Examiner (CFE)
• Examined and certified by Project Management Institute (PMI) as a Project Management Professional (PMP)
• Examined and certified by the Association for the Advancement of Cost Engineering (AACE International) as a Planning and S...
View Full Profile
walter mcbrier
Construction Delay & Cost Expert Witness
GCM Group LLC
BOISE, Idaho
Construction, Construction Engineering
-
construction delay analysis, schedule analysis, forensic schedule analysis, Time impact analysis (TIA), Critical Path Method (CPM), Construction Claims, Change Order Disputes, Construction Cost Analysis, Cost Estimating, Project Controls, Project Scheduling, Construction Damages, Construction Litigation Support
Walter McBrier is a construction executive and Licensed Professional Engineer (P.E., Civil - Idaho) with over 20 years of experience providing forensic analysis, litigation support, and expert testimony in complex construction disputes. His career includes leadership roles as a Vice President of a General Contracting firm and Global Cost Manager for a $500M+ owner portfolio, providing him with a unique 360-degree perspective on project delivery, schedule manipulation, and cost management. This comprehensive background enables him to deliver clear, defensible opinions that attorneys and clients rely upon in state and federal litigation, arbitration, and mediation.
Areas of Expertise
Construction Delay & Schedule Analysis: Forensic schedule analysis, Critical Path Method (CPM), Time Impact Analysis (TIA), delay damages, and recovery planning. Experienced with Primavera P6 and Microsoft Project.
Cost Forensics & Damages: Cost estimating, quantification of cost overruns, change order...
View Full Profile
Amin Terouhid, Ph.D., PE, PMP, CFE
Scheduling, defect, safety, damages,& fraud expert
Adroit Consultants, LLC
Upper Saddle River, New Jersey
Construction Defects, OSHA
-
Civil Engineering, industrial engineering, forensic schedule and delay analysis, construction safety, slip and fall, construction injury, personal injury, standard of care, fraud, construction inspection, loss of productivity, critical path method (CPM), OSHA, damages expert, damages analysis, trip and fall, CPM, scheduling, Delay
Dr. Amin Terouhid is a Principal Consultant with Adroit Consultants, LLC. He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, construction defects, construction fraud, defects, and injury cases. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims.
Served numerous times as an expert witness in trial, testimony, and deposition.
Licenses
• Examined and certified as a Professional Engineer (P.E.)
• Examined and certified by the Association of Certified Fraud Examiners as a Certified Fraud Examiner (CFE)
• Examined and certified by Project Management Institute (PMI) as a Project Management Professional (PMP)
• Examined and certified by the Association for the Advancement of Cost Engineering (AACE International) as a Planning and S...
View Full Profile
Amin Terouhid, Ph.D., PE, PMP, CFE
Scheduling, defect, safety, damages,& fraud expert
Adroit Consultants, LLC
New York
Construction Defects, OSHA
-
Civil Engineering, industrial engineering, forensic schedule and delay analysis, construction safety, slip and fall, construction injury, personal injury, standard of care, fraud, construction inspection, loss of productivity, critical path method (CPM), OSHA, damages expert, damages analysis, trip and fall, CPM, scheduling, Delay
Dr. Amin Terouhid is a Principal Consultant with Adroit Consultants, LLC. He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, construction defects, construction fraud, defects, and injury cases. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims.
Served numerous times as an expert witness in trial, testimony, and deposition.
Licenses
• Examined and certified as a Professional Engineer (P.E.)
• Examined and certified by the Association of Certified Fraud Examiners as a Certified Fraud Examiner (CFE)
• Examined and certified by Project Management Institute (PMI) as a Project Management Professional (PMP)
• Examined and certified by the Association for the Advancement of Cost Engineering (AACE International) as a Planning and S...
View Full Profile
Amin Terouhid, Ph.D., PE, PMP, CFE
Scheduling, defect, safety, damages,& fraud expert
Adroit Consultants, LLC
Texas
Construction Defects, OSHA
-
Civil Engineering, industrial engineering, forensic schedule and delay analysis, construction safety, slip and fall, construction injury, personal injury, standard of care, fraud, construction inspection, loss of productivity, critical path method (CPM), OSHA, damages expert, damages analysis, trip and fall, CPM, scheduling, Delay
Dr. Amin Terouhid is a Principal Consultant with Adroit Consultants, LLC. He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, construction defects, construction fraud, defects, and injury cases. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims.
Served numerous times as an expert witness in trial, testimony, and deposition.
Licenses
• Examined and certified as a Professional Engineer (P.E.)
• Examined and certified by the Association of Certified Fraud Examiners as a Certified Fraud Examiner (CFE)
• Examined and certified by Project Management Institute (PMI) as a Project Management Professional (PMP)
• Examined and certified by the Association for the Advancement of Cost Engineering (AACE International) as a Planning and S...