2 Connectors Expert Witnesses Found

Results Sorted Below by State

Joseph Quinn, M.S., P.E. Materials FACT

Los Angeles, California
Failure Analysis, Metallurgy - Automobile, Aviation & Aerospace, Motorcycle,Appliance, Engineering, Construction, Construction Defects, Corrosion, Maritime, Equipment & Machinery, Mining, Bicycles, Transportation, Medical Devices, Manufacturing, Plumbing, Products Liability, Fire, Electricity, Pipe, HVAC, CPVC, Oil & Gas, Welding
.... • Fracture analysis of Metals, Plastics & Glass • Corrosion & Degradation of Materials • Mechanical Behavior of Materials • Fasteners • Fire Sprinkler Systems • Mechanical Failures • Weld, Braze, & Solder failures • Plumbing Pipes, fittings & Valves • Aircraft • Automobile components • Turbine Blades • Amusement Rides • Copper, CPVC, PEX Tubing/Pipes • Household Appliances & Consumer Products • Construction Equipment & Machinery • Construction Tools • Process Piping • Electrical Connectors, Wires & Devices • Medical Devices & Instruments • Fitness Equipment

Lester Weitman Lester Weitman Consulting, LLC

Coral Springs, Florida
Automotive, Products Liability - wiring, electrical, fire, defect, design, failure, electronics, battery, motor, module, engineering, connector, instrument, cluster, speedometer, HVAC, charging, alternator, starter, validation, vehicle, automotive, forensic,
...As a Ford Quality Supervisor in Electrical, I guided electronic module, wiring, connector, battery, starter and alternator engineers in development of Failure Mode Avoidance & Design Validation to avoid defects. I audited Field Warranty Data, including NHTSA investigations and recalls, for signs of emerging issues on wiring, instrumentation and climate control electronics. Worked with engineers using scientific methodology to identify proper cause(s) and develop robust fixes and preventative actions. Attended Supplier manufacturing process reviews, identifying plant improvements. An expert in Ford Development Process and Lead ISO 9001 auditor and trainer for Electronics. As a Design and System Engineer, I was Project Manager for cost, quality and timing of electrical product content on the 2000 - 03 Mustang and 1988-90 new car models. Led issues resolutions and presented action plans to management....