Delay Analysis Expert Witness Listings
Welcome to our Delay Analysis experts directory. Browse the profiles below to find the right expert witness in Delay Analysis for your case. Our SEAK Expert Witness Database is always free to search.
SEAK, Inc. is The Expert Witness Training Company. We have trained thousands of expert witnesses, through our seminars, on-site corporate training, assisting retaining counsel to prepare their witnesses, and one-on-one training for individual experts. For additional information please visit testifyingtraining.com
Unable to find the right expert? For personalized assistance in locating an expert witness, please click here.
Amy S Heine, PE, CCP, PSP Hirschmugl, Heine & Associates, Inc
Mammoth Lakes, California
Construction Engineering, Construction
-
Construction Engineering, Forensic Schedule Analysis, Claim Preparation, CPM Scheduling, Design-Build, Strategic Project Planning, Primavera P6, Construction Impacts, Delay Analysis, Infrastructure, Heavy Civil, Tunnels
Ms. Heine holds a Master of Science degree in Civil Engineering from the University of Washington and a Bachelor of Arts degree in Economics from the University of California, San Diego. She is a licensed civil engineer in the states of California, Colorado, Maryland, Minnesota, and Wisconsin. She has over 25 years of experience in the construction industry working in numerous roles, such as Senior Project Engineer, Project Controls Manager, Project Engineer, Project Estimator and Project Manager. She currently serves as Principal and President of Hirschmugl, Heine & Associates, where she offers expert consulting and engineering services in the areas of planning and scheduling, temporary works design, claims consulting, and project management.
Ms. Heine primarily works with Heavy Civil Contractors nationwide and has experience working on Federal, State and Local government Contracts. She has provided critical expert witness testimony on heavy civil projects in Utah, Washington D.C...
Click for Full Listing and Contact Info
Amin Terouhid, Ph.D., PE, PMP, PSP Adroit Consultants, LLC
Cliffside Park, New Jersey
Construction, Construction Defects
-
Civil Engineering, industrial engineering, construction forensic schedule analysis, delay analysis, construction safety, concrete inspection, standard of care, construction simulation and modeling, construction inspection, loss of productivity, critical path method (CPM), OSHA
Dr. Amin Terouhid is a Principal Consultant with Adroit Consultants, LLC. He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, and construction defects. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims.
Licenses
• Examined and certified by the Texas Board of Professional Engineers and Land Surveyors (TBPELS) as a Professional Engineer (P.E.)
• Examined and certified by Project Management Institute (PMI) as a Project Management Professional (PMP)
• Examined and certified by the Association for the Advancement of Cost Engineering (AACE International) as a Planning and Scheduling Professional (PSP) and a Decision and Risk Management Professional (DRMP)
• Examined and certified by American Concrete Institute (ACI) as a Concrete ...
Click for Full Listing and Contact Info