Delay Claims Expert Witnesses
Delay claims expert witnesses and consultants listed here may be able to form expert opinions, draft expert witness reports, provide expert witness testimony at deposition and/or trial as or serve as consulting (non-testifying) experts on delay claims. The delay claims expert witness listings on this page are typically from fields/areas of expertise such as: Architecture, Construction Defects, and HVAC.
Joseph A LaRovere, C.E.M. LaRovere Consulting, LLC
Cave Creek, Arizona
HVAC, Construction Defects
-
HVAC, Plumbing, Mechanical, Chillers, Boilers, Air Handlers, Heat Pumps, Delay Claims, damages, leaks, failures, water heaters, flooding, electrical, packaged equipment, condensers, heat exchangers, piping modifications, litigation
35+ years of experience as a contractor, owner/operator, technician, and consultant to the construction industry with specialties in HVAC, Mechanical, Electrical, Plumbing, Energy Management and Control Systems.
Specialties
HVAC Systems, air conditioning, heat pumps, chiller plants, heating hot water, boilers, air handlers, water source heat pumps, cooling towers, dedicated outside air, ventilation, and exhaust systems, Energy management and control system, sequence of operation, energy management and building efficiency, Domestic hot water systems, electric and gas boilers and water heaters, mixing valves and hot water recirculation systems, System failures, equipment failures, maintenance issues, preventative maintenance, water treatment, forensic investigation, and remediation, Project Management, Program Management, Project Accounting, and Scheduling consulting and analysis
Contractor Evaluation, Contract Review, Contractor Standard of Care, Engineering Evaluation, Site Inspec...
Peter Vander Heide, RA, LEED AP G. Peter Vander Heide, AIA
New Jersey
Construction Defects, Architecture
-
stucco, building envelope, architecture, ADA, moisture intrusion, WUFI analysis, space frames, stairways, windows, building codes, roofing, delay claims, vapor barriers, air barriers, slip trip & fall, OSHA
Mr. Vander Heide is a practicing architect, registered in MI, PA & NJ. First registration was in MI in 1974. His career has included: full time work for a structural systems (space-frames) manufacturer, doing project engineering and later management; management of a hundred person architecture, engineering, landscape architecture, interior design firm; capital budgeting and owner led improvements of city government buildings; and the independent practice of architecture. Direct hands on experience includes construction inspections across North America, CADD contract documents, 3D computer modeling and animations. Management experience includes capital budgeting, project management and firm management. He is a voting member of ASTM Committee E:06 Performance of Buildings. He can bring building sciences to the table, as he has attended many WUFI advanced seminars and RCI conventions.. He started expert witness work in 2004 and has been a player in cases from ADA to trip and fall...
Peter Vander Heide, RA, LEED AP G. Peter Vander Heide, AIA
Philadelphia, Pennsylvania
Construction Defects, Architecture
-
stucco, building envelope, architecture, ADA, moisture intrusion, WUFI analysis, space frames, stairways, windows, building codes, roofing, delay claims, vapor barriers, air barriers, slip trip & fall, OSHA
Mr. Vander Heide is a practicing architect, registered in MI, PA & NJ. First registration was in MI in 1974. His career has included: full time work for a structural systems (space-frames) manufacturer, doing project engineering and later management; management of a hundred person architecture, engineering, landscape architecture, interior design firm; capital budgeting and owner led improvements of city government buildings; and the independent practice of architecture. Direct hands on experience includes construction inspections across North America, CADD contract documents, 3D computer modeling and animations. Management experience includes capital budgeting, project management and firm management. He is a voting member of ASTM Committee E:06 Performance of Buildings. He can bring building sciences to the table, as he has attended many WUFI advanced seminars and RCI conventions.. He started expert witness work in 2004 and has been a player in cases from ADA to trip and fall...