15 Delay Claim Analysis Expert Witnesses Found
Results Sorted Below by State
Christopher Lavache C. Lavache Management & Consulting, LLC
Arizona
Construction, Construction Defects
-
Construction Manager Expert, Estimator, Construction Scheduler, General Contractor Expert, Licensed General Contractor, Quality Assurance, Construction Defects, Schedule Delays and Impacts, Loss Control Advisor, Condominium, Commercial Office, High-End Residential
...Construction expert witness testimony and litigation consulting services include forensic document analysis, standard of care, cost estimating, forensic site investigations, contract disputes, schedule delay/impact analysis, expert to expert negotiations, report preparation, change order/cost and claim management, water intrusion and construction/material defect consulting.
Construction Consulting Services: Provide agency fee-only construction management services, which include budgeting and cost estimating; scheduling and delay/impact analysis; quality assurance and quality control inspections, monthly construction progress reviews, and reporting. Provide property evaluations and property assessment services for property owners and lenders. Quality assurance manager and loss/risk control consultant for owners, lenders and insurance carrier’s loss control divisions. Manage residential renovations and reconstruction as construction manager/Owner’s representative....
Richard W Brand, AIA, NCARB, CPM, PMP, DBIA
Santa Monica, California
Architecture, Construction
-
Project Management, Program Management, Construction Management Standard of Care Failures, Construction Documents, Change Order, Design Coordination, Building Envelope Failure, Construction Defects, Architectural Professional Liability Failures, Water Intrusion, Construction Administration
...As an Expert Witness I have performed Standard of Care analysis of Architects/Engineer and Project Management Performance Reviews in Architect/Engineer negligence claims. Investigated Construction defects, Contractor Non-Compliance, and Owner Payment / Change Order Delay Claims.
As the Principal Project Director / Design & Construction Training & Construction Lead for the second largest K-12 school district in the country and their $35 billion construction bond program that included developing new Policies and Procedures RFQs, RFPs, Bid Award, Contract Execution, Construction Management, Constructability Reviews, Owner Move-in and Project Closeout for general construction contracts including Design Bid Build, Design Build, Professional Services (A/E, Inspection and Testing Services, Consulting Services) using electronic management programs and applications....
Amy S Heine, PE, CCP, PSP Hirschmugl, Heine & Associates, Inc
Mammoth Lakes, California
Construction Engineering, Construction
-
Construction Engineering, Forensic Schedule Analysis, Claim Preparation, CPM Scheduling, Design-Build, Strategic Project Planning, Primavera P6, Construction Impacts, Delay Analysis, Infrastructure, Heavy Civil, Tunnels
...She currently serves as Principal and President of Hirschmugl, Heine & Associates, where she offers expert consulting and engineering services in the areas of planning and scheduling, temporary works design, claims consulting, and project management.
Ms. Heine primarily works with Heavy Civil Contractors nationwide and has experience working on Federal, State and Local government Contracts. She has provided critical expert witness testimony on heavy civil projects in Utah, Washington D.C., and New York. Ms....
Christopher Lavache C. Lavache Management & Consulting, LLC
El Cajon, California
Construction, Construction Defects
-
Construction Manager Expert, Estimator, Construction Scheduler, General Contractor Expert, Licensed General Contractor, Quality Assurance, Construction Defects, Schedule Delays and Impacts, Loss Control Advisor, Condominium, Commercial Office, High-End Residential
...Construction expert witness testimony and litigation consulting services include forensic document analysis, standard of care, cost estimating, forensic site investigations, contract disputes, schedule delay/impact analysis, expert to expert negotiations, report preparation, change order/cost and claim management, water intrusion and construction/material defect consulting.
Construction Consulting Services: Provide agency fee-only construction management services, which include budgeting and cost estimating; scheduling and delay/impact analysis; quality assurance and quality control inspections, monthly construction progress reviews, and reporting. Provide property evaluations and property assessment services for property owners and lenders. Quality assurance manager and loss/risk control consultant for owners, lenders and insurance carrier’s loss control divisions. Manage residential renovations and reconstruction as construction manager/Owner’s representative....
Matthew Furlong, CBC, RBC Först Consulting Group
District Of Columbia
Construction Defects, Construction
-
Forensic investigation, building pathology, failure analysis, technical reporting, construction claims, litigation support, insurance, building code, EIFs, stucco, building envelope, facades, rainscreen, infrared, moisture, structural capability, energy conservation, contract analysis.
...Matthew Furlong specializes in construction defect and failure analysis, forensic engineering, scientific investigations, technical report writing and expert witness testimony for construction claims and litigation matters. Mr. Furlong has 21 years of experience with construction, project coordination and design, remodeling, and field inspections of building systems for residential, and commercial low and high-rise properties. He has successfully completed more than 600 unique and custom projects while as a general contractor.
His builder background experience ranges from high-end new custom home construction, interior renovations and additions, to green building and energy efficient homes, historical renovations, timber-framing, and creating elaborate custom interiors in prestigious estate-sized homes. This experience gives Mr. Furlong the unique qualifications to testify as an expert in construction matters. As a professional consultant, Mr....
Randy P Wall, PE, MPA Professional Engineering Services
Boise, Idaho
Civil Engineering, Construction Engineering
-
Right-of-Way, Grading & Drainage, Hillside Homes, Due Diligence, Inverse Condemnation, Construction Defects, Wood Engineering, High-end Homes, Eminent Domain, Residential Structural, Land Use & Zoning, Permitting & Entitlements, Road & Highway Design, Land Use Planning, Local Government, Forensics
...These services include forensic analysis and expert witness for the structural, site, grading, and drainage design and construction of high-end custom single-family residences located in lower elevations, hillsides, and snow countries; professional and premise liability; risk assessment and mitigation; Civil and Structural Engineering; professional liability claim assessments; forensic analysis for personal injury and property loss claims; construction due diligence, schedule impact, delay claims, and contracting; and litigation support and expert testimony. Mr....
Michael A. Pollock, P.E. Cogent Experts, LLC
New Jersey
Engineering, Construction Defects
-
Standard of care, construction defect, construction delay, engineering, mechanical engineering, HVAC, project management, construction schedule analysis, manufacturing, product liability, power, refrigeration, fire, explosion, automotive, forensics, failure analysis, engineering standard of care
...Warehouse Distribution Facility – Maryland - Evaluated a $10M (million) claim relating to purported construction defect claims by the 600,000 sq. ft. facility owner against the facility construction contractor and an original equipment manufacturer (OEM) relating to installed infrastructure in the facility. Devel-oped and provided an expert opinion and expert report regarding the analysis of the purported defects and a proposed repair solution to correct said defects. Reviewed numerous reports regarding the matter includ-ing structural, repair/maintenance, operations related etc. to determine opinion. The matter settled favor-ably for our client prior to federal court trial.
Psychiatric Hospital Facility – North Carolina – Evaluated a $28M (million) construction claim by the general contractor against a hospital facility concerning a $100M facility construction project....
Amin Terouhid, Ph.D., PE, PMP, CFE Adroit Consultants, LLC
Upper Saddle River, New Jersey
Construction Defects, OSHA
-
Civil Engineering, industrial engineering, forensic schedule and delay analysis, construction safety, slip and fall, construction injury, concrete inspection, standard of care, construction simulation and modeling, construction inspection, loss of productivity, critical path method (CPM), OSHA
...He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, construction defects, and injury cases. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims.
Served numerous times (in more than 100 cases) in the capacity of a consulting expert. Currently (Feb 2022) involved in one international arbitration case for a multimillion-dollar claim in the court of London and three other cases, including a construction delay and loss of productivity claim for a megaproject in New York, a construction injury case, and a slip and fall case in the United States....
Peter Vander Heide, RA, LEED AP G. Peter Vander Heide, AIA
New Jersey
Construction Defects, Architecture
-
stucco, building envelope, architecture, ADA, moisture intrusion, WUFI analysis, space frames, stairways, windows, building codes, roofing, delay claims, vapor barriers, air barriers, slip trip & fall, OSHA
Mr. Vander Heide is a practicing architect, registered in MI, PA & NJ. First registration was in MI in 1974. His career has included: full time work for a structural systems (space-frames) manufacturer, doing project engineering and later management; management of a hundred person architecture, engineering, landscape architecture, interior design firm; capital budgeting and owner led improvements of city government buildings; and the independent practice of architecture. Direct hands on experience includes construction inspections across North America, CADD contract documents, 3D computer modeling and animations. Management experience includes capital budgeting, project management and firm management. He is a voting member of ASTM Committee E:06 Performance of Buildings. He can bring building sciences to the table, as he has attended many WUFI advanced seminars and RCI conventions.. He started expert witness work in 2004 and has been a player in cases from ADA to trip and fall to...
Amin Terouhid, Ph.D., PE, PMP, CFE Adroit Consultants, LLC
New York
Construction Defects, OSHA
-
Civil Engineering, industrial engineering, forensic schedule and delay analysis, construction safety, slip and fall, construction injury, concrete inspection, standard of care, construction simulation and modeling, construction inspection, loss of productivity, critical path method (CPM), OSHA
...He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, construction defects, and injury cases. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims.
Served numerous times (in more than 100 cases) in the capacity of a consulting expert. Currently (Feb 2022) involved in one international arbitration case for a multimillion-dollar claim in the court of London and three other cases, including a construction delay and loss of productivity claim for a megaproject in New York, a construction injury case, and a slip and fall case in the United States....
Michael A. Pollock, P.E. Cogent Experts, LLC
Bryn Mawr, Pennsylvania
Engineering, Construction Defects
-
Standard of care, construction defect, construction delay, engineering, mechanical engineering, HVAC, project management, construction schedule analysis, manufacturing, product liability, power, refrigeration, fire, explosion, automotive, forensics, failure analysis, engineering standard of care
...Warehouse Distribution Facility – Maryland - Evaluated a $10M (million) claim relating to purported construction defect claims by the 600,000 sq. ft. facility owner against the facility construction contractor and an original equipment manufacturer (OEM) relating to installed infrastructure in the facility. Devel-oped and provided an expert opinion and expert report regarding the analysis of the purported defects and a proposed repair solution to correct said defects. Reviewed numerous reports regarding the matter includ-ing structural, repair/maintenance, operations related etc. to determine opinion. The matter settled favor-ably for our client prior to federal court trial.
Psychiatric Hospital Facility – North Carolina – Evaluated a $28M (million) construction claim by the general contractor against a hospital facility concerning a $100M facility construction project....
Peter Vander Heide, RA, LEED AP G. Peter Vander Heide, AIA
Philadelphia, Pennsylvania
Construction Defects, Architecture
-
stucco, building envelope, architecture, ADA, moisture intrusion, WUFI analysis, space frames, stairways, windows, building codes, roofing, delay claims, vapor barriers, air barriers, slip trip & fall, OSHA
Mr. Vander Heide is a practicing architect, registered in MI, PA & NJ. First registration was in MI in 1974. His career has included: full time work for a structural systems (space-frames) manufacturer, doing project engineering and later management; management of a hundred person architecture, engineering, landscape architecture, interior design firm; capital budgeting and owner led improvements of city government buildings; and the independent practice of architecture. Direct hands on experience includes construction inspections across North America, CADD contract documents, 3D computer modeling and animations. Management experience includes capital budgeting, project management and firm management. He is a voting member of ASTM Committee E:06 Performance of Buildings. He can bring building sciences to the table, as he has attended many WUFI advanced seminars and RCI conventions.. He started expert witness work in 2004 and has been a player in cases from ADA to trip and fall to...
Matthew J. Bunkers, Ph.D., CCM Northern Plains Weather Services, LLC
Rapid City, South Dakota
Meteorology, Hydrology
-
forensic meteorology, heavy rain and flooding, high winds, fog, severe storms, hail, tornadoes, winter weather, heavy snow, slip and falls, icing, fire weather, weather-related accidents, agriculture weather, lightning verification, radar, satellite, and applied climate and meteorology
...I have worked on cases involving:
• analyses of tornado/hail/wind (including derecho) damage to businesses, crops, people, farm property, and housing units for insurance-related claims/lawsuits,
• climate and weather analyses for a mining operation, preventative planting insurance claim, crop spraying, and livestock operations,
• rainfall recurrence interval analyses for flooding of homes and flash-flood related damages to businesses and trains/railroad tracks,
• snowfall and rainfall analyses for insurance protection claims for recreational events,
• climate and severe weather documentation for construction delays and adverse weather days,
• cloud cover/moonlight, rainfall, fog, and icing/snow/wind analyses for automobile accidents,
• slips and falls related to snowfall, icing/refreezing, and freezing drizzle,
• windstorm and drought analysis for a wildfire,
• fire-weather observations and research papers for a fellow consulting meteorologist,
• a technical review of a weather book,
•...
Amin Terouhid, Ph.D., PE, PMP, CFE Adroit Consultants, LLC
Texas
Construction Defects, OSHA
-
Civil Engineering, industrial engineering, forensic schedule and delay analysis, construction safety, slip and fall, construction injury, concrete inspection, standard of care, construction simulation and modeling, construction inspection, loss of productivity, critical path method (CPM), OSHA
...He leads a vibrant consulting practice on construction claim matters especially in the areas of delay analysis, loss of productivity, claims for changes, construction defects, and injury cases. With extensive experience working on several large and mega construction projects internationally and throughout the United States, he is a recognized expert in preparing and investigating construction claims.
Served numerous times (in more than 100 cases) in the capacity of a consulting expert. Currently (Feb 2022) involved in one international arbitration case for a multimillion-dollar claim in the court of London and three other cases, including a construction delay and loss of productivity claim for a megaproject in New York, a construction injury case, and a slip and fall case in the United States....
Matthew Furlong, CBC, RBC Först Consulting Group
Middleburg, Virginia
Construction Defects, Construction
-
Forensic investigation, building pathology, failure analysis, technical reporting, construction claims, litigation support, insurance, building code, EIFs, stucco, building envelope, facades, rainscreen, infrared, moisture, structural capability, energy conservation, contract analysis.
...Matthew Furlong specializes in construction defect and failure analysis, forensic engineering, scientific investigations, technical report writing and expert witness testimony for construction claims and litigation matters. Mr. Furlong has 21 years of experience with construction, project coordination and design, remodeling, and field inspections of building systems for residential, and commercial low and high-rise properties. He has successfully completed more than 600 unique and custom projects while as a general contractor.
His builder background experience ranges from high-end new custom home construction, interior renovations and additions, to green building and energy efficient homes, historical renovations, timber-framing, and creating elaborate custom interiors in prestigious estate-sized homes. This experience gives Mr. Furlong the unique qualifications to testify as an expert in construction matters. As a professional consultant, Mr....