Critical Path Expert Witnesses
Critical path expert witnesses and consultants listed here may be able to form expert opinions, draft expert witness reports, provide expert witness testimony at deposition and/or trial as or serve as consulting (non-testifying) experts on critical path. The critical path expert witness listings on this page are typically from fields/areas of expertise such as: Construction and Construction Defects.
L Fredrick Nolta Nolta Consulting
San Diego, California
Construction, Construction Defects
-
Claim, Cost of Repair, Schedule / Delay, Critical Path, Accident / Injuries, Safety, Construction Management CM, General Contractor GC, Subcontractor, Engineering Contractor, Concrete, Precast, Steel Erection, Wood, Excavation, Trenching, Shoring, Hospital, DSA, Public Works, Indian Gaming, Permit
Expert witness since 2009 with case experience in: construction defect, contract dispute, delay, scheduling, cost of repair, water intrusion, Cal OSHA, safety, accident, injury, trip fall, employment, wrongful termination, probate, real estate, failure to disclose, etc.
Construction Engineer with 40 + years of continuous construction experience as a general, sub and concrete contractor. Career positions progressing from: laborer, field engineer, superintendent, estimator, project manager, project executive to principal. Licensed contractor with classifications in: “A” Engineering, “B” Building & “C-8” Concrete.
Product Type Experience: Residential, commercial, health care, education, light industrial, military, public works, and site development including: offices, retail, restaurants, food service, multifamily high-rise, apartments, condos, hospitals, medical office buildings (MOB), hotels, schools, stadium, theater, parking, power / co-generation, waste water treatment, zoos, ...
Paul L. Johnson Gryphon Consulting
Holiday, Florida
Construction Defects, Construction
-
Residential, commercial, leaks, tenant fit-outs, kitchens, baths, remodels, construction related slip-fall & personal injury, historic buildings, restaurants, roofs, siding, critical path, luxury construction, high-end construction, wine cellars, cabinetry, Schluter Systems, tile, stone, masonry
Award-Winning construction professional. 45 years of hands-on experience. Founder/operator of two highly-successful construction firms. Experience includes all aspects of residential and high-end residential construction, new builds and remodeling, light commercial construction and tenant build-out - multiple new builds, over 60 whole home remodels, over 500 kitchen remodels, approximately 400 master bath remodels, numerous tenant fit out projects, restaurants, and a historic landmark complete renovation. Extensive consulting experience as an Owner's Representative. Patented inventor of a cabinet installation assembly. Author of the book Residential Building & Remodeling, On Amazon https://www.amazon.com/dp/B0CJ7GMDJM.
I work to stay current on construction processes, materials, technique's, industry changes and codes through construction of investment properties.
Areas of expertise include, but are not limited to:
• Construction Defects
• Personal Injury resulting from Cons...
Lane A Feick, PE Owner Rep Consulting
Annapolis, Maryland
Construction, Construction Defects
-
Estimating,Project Management,Cost Control,Claims,Change Orders,Differing Site Conditions,Breaches of Contract,Leaks,Grading,Site Work,Scheduling,Critical Path
Oversight of daily field operations inclusive of coordinating subcontractors, suppliers and field employees, quality control, monitoring the project schedule and maintaining a safe workplace. Thirty (30+) years of construction management, general contracting, and bank inspection experience. Licensed Professional Engineer in Maryland, South Carolina, and North Carolina.